Skip to main content
Aerial project overview of a completed modular workforce lodge beside a lake
Our Work

Projects

Modular installations and construction projects across Canada's most remote regions — from Nunavut to Alberta.

Crane lifting a modular unit in Nunavut

Multi-Unit Modular Installation

Scope
Delivery and installation of multiple modular units to a fly-in community, coordinated around a short summer sealift and barge window.
Challenge
No road access; materials, modules, and equipment had to arrive by air or sealift within a narrow seasonal window, with no opportunity to reorder missed items.
Result
Units were staged, barged, and craned into place on schedule, with structural and utility tie-ins completed before winter set in.
Completed modular office complex in Northern British Columbia

Modular Office Complex

Scope
A modular office building delivered and assembled on a remote forestry-industry site.
Challenge
Limited local trade availability and long-distance material logistics required most of the build to be completed off-site before mobilization.
Result
A fully finished, weatherproofed facility was handed over with minimal on-site labour days, reducing camp and accommodation costs.
Crane setting a modular unit onto a pile foundation in Yukon

Pile Foundation & Module Set

Scope
Foundation preparation and modular unit installation on a site with limited equipment access and a compressed winter schedule.
Challenge
Frozen ground conditions and a short construction window required foundation work and module fabrication to proceed in parallel rather than in sequence.
Result
The module was craned onto the completed pile foundation and set within the available weather window, keeping the project on schedule.
Completed modular government facility in Northern Alberta

Modular Government Facility

Scope
A modular government facility installed to serve a growing community, replacing aging infrastructure.
Challenge
Coordinating multiple building modules and utility tie-ins on a compressed public-sector timeline.
Result
The facility was assembled, connected, and turned over ready for occupancy on schedule.
Finished modular cabin in a forest setting

Finished Modular Cabin

Scope
A single modular cabin delivered and finished on a forested site.
Challenge
Site access required careful crane placement and foundation work around existing terrain and trees.
Result
The cabin was set, connected, and finished with minimal disturbance to the site.
Roofing installation on a modular building near the coast

Roofing & Building Envelope

Scope
Roofing and building-envelope completion on a modular building in a coastal, weather-exposed location.
Challenge
Wind exposure and unpredictable weather required tight sequencing to protect the building envelope during the work.
Result
The roofing and envelope work was completed and made weathertight ahead of the seasonal weather window closing.

Case studies are representative of typical project scope and site conditions.

Have a project in mind?